
CORIGY SPC01 Solar Carport is an innovative and robust solar mounting solution designed for both residential and commercial parking needs. Built with hot-dip galvanized steel, the structure offers outstanding durability, corrosion resistance, and a clean, modern appearance. Its single-column design enhances aesthetics while maintaining structural stability and ease of vehicle parking.
All components that can be pre-assembled are handled at the factory prior to delivery, significantly reducing on-site installation time and labor costs.

🔩 Key Advantages of the SPC01 Solar Carport:
- ✅ Hot-Dip Galvanized Steel Frame – Exceptional corrosion resistance, ideal for long-term outdoor use with no need for painting.
- ✅ Single-Column Design – Modern and space-efficient, maximizing parking convenience and structural stability.
- ✅ Fast Installation – Factory pre-assembly reduces site labor and ensures quicker deployment.
- ✅ Dual Functionality – Acts as a vehicle shelter and solar power generation platform.
- ✅ Wide Compatibility – Works with all standard solar panels and inverter systems.
- ✅ Custom Engineering Support – Structural engineering service available to meet site-specific requirements.
- ✅ Weather Resilience – Available with snow and wind load options for various climates.

📊 Technical Specifications:
Parameter | Description |
---|---|
Model No. | SPC01 |
Material | Hot-dip Galvanized Steel |
Surface Treatment | Zinc Coating (No Painting Required) |
Tilt Angle | 0–15° (Customizable) |
Snow Load Capacity | Up to 1.6 kN/m² |
Wind Speed Tolerance | Up to 60 m/s |
Installation Site | Ground (Residential / Commercial) |
Design Standards | AS/NZS 1170, ASCE 7-10, IBC 2009 |
Service Life | 25 Years |
🌞 Application Scenarios:
- Homeowners seeking clean energy and vehicle protection
- Commercial buildings adding EV charging stations
- Solar developers looking for dual-purpose land use
- Public facilities such as malls, hospitals, and schools

⭐ User Reviews & Feedback:
“We installed the SPC01 carport for our EV charging project in the office parking lot. The installation was incredibly fast thanks to the pre-assembled parts, and the structure feels extremely solid. It’s a great investment for both sustainability and infrastructure.”